SEATTLE AQUARIUM 2023-2024
Served as assistant project manager and engineering coordinator, developing complex organic geometries and guiding the drafting team through final production drawings for CNC fabrication. The exhibit required translating a highly sculptural design into buildable components, with no straight surfaces—featuring fully curved wood forms, organic fiberglass bezels, and compound-curved glass tank interfaces. The project demanded rigorous coordination between design intent and engineering feasibility.
Project Manager: Dave Campbell
Design Company: Thinc Design